Spec board / Strata coordination
Plan Surrey Strata Painting Decisions and Access
The technical painting scope and the strata decision record should develop together. Property boundaries, approval authority and resident impacts affect what can be priced and when work can proceed.
- Sections
- 7
- Evidence links
- 3
- Scope state
- Open
- REQ-01Assemble the strata and building record
Collect the strata plan, bylaws, rules, relevant resolutions, depreciation or condition reports, earlier painting records and available building drawings. Identify the buildings, elevations, common areas and strata-lot interfaces under consideration. The Province's common-property guidance explains why the plan and filed records matter, but the current documents and project facts control the actual decision. Maintain an index so council can trace each scope statement to its source rather than relying on recollection. When a depreciation report informs the painting brief, identify its date, the component or buildings covered and the maintenance assumptions behind the forecast. Ask what condition or cost information has changed since that report and what needs current investigation or a written quotation before award. Keep the report's projected allowance separate from the bidder's verified quantities, preparation and access assumptions; do not treat a forecast as an agreed painting scope or contract price.
- Date documents and mark superseded colour or scope decisions.
- Keep owner-reported interior concerns separate from observed common areas.
- REQ-02Clarify property boundaries and responsibility questions
Exterior walls, balconies, doors, windows and limited common property can involve different records and responsibilities. Do not assume that physical access or prior maintenance establishes ownership. Map uncertainty and obtain appropriate legal or professional advice where needed. A painting scope can show the surfaces proposed for work while the decision file separately records who authorizes and funds them. This separation reduces the risk of bidders pricing areas that the strata has not approved or that require owner coordination.
- Use strata-plan references where a boundary affects scope.
- Record unresolved responsibility questions before issuing the bid package.
- REQ-03Record decision authority and colour approval
Identify who can authorize investigation, sample work, colour selection, contract award, contingency use and changes. Record whether a council resolution, owner vote, planning review or other approval is required for the actual proposal. The City of Surrey notes that appearance changes can be relevant within building-envelope remediation review, but simple painting and larger envelope work are not automatically the same scope. Confirm requirements rather than turning a general page into a legal conclusion.
- Name the approving body beside each decision milestone.
- Keep colour references and signed sample approvals in the project file.
- REQ-04Map balconies, patios and unit-access needs
Create a schedule showing balconies, patios, windows, doors and other areas that may require resident preparation or access. State what residents must move, what the contractor protects and what cannot be reached without unit entry. Coordinate pets, security and privacy without publishing personal details in the general bid package. Avoid promising access dates before the contract sequence and notice periods are confirmed. A consistent unit or elevation code helps notices and deficiency records refer to the same location.
- Prepare an access exception process for missed or restricted areas.
- Define who communicates directly with residents and owners.
- REQ-05Plan resident notices and daily handoff
Set notice types for access, balcony clearing, parking restrictions, noise, odour, closed routes and weather changes. Identify the strata contact for questions and the contractor contact for site coordination. Daily records should show which zones opened, remained restricted or need return work. Product and ventilation questions belong in the project safety planning rather than a generic promise of odour-free work. Keep emergency and complaint escalation paths clear without representing the site as an emergency service.
- Use dated notices tied to the current work sequence.
- Record zone reopening and outstanding protection at each handoff.
- REQ-06Control discoveries, substitutions and schedule changes
Use a numbered change process for added repairs, hazardous-material findings, access changes, product substitutions and weather effects. Each change should identify the location, evidence, proposed response, price or pricing method, schedule impact and approving authority. Do not let verbal site instructions replace written council authorization. Track committed contingency separately from paid amounts, and communicate resident impacts when an approved change alters the sequence or access plan.
- Attach photographs and updated scope lines to each change record.
- State whether a change affects colours, products or future maintenance records.
- REQ-07Deliver a searchable strata closeout package
Collect the final contract, changes, invoices, product and safety data, approved samples, colour schedule, deficiency resolution, maintenance instructions and location-labelled photographs. Record areas not completed or deferred and the reason. Add a short building-by-building index so future councils can locate the installed product and decision record without searching email. Closeout should preserve what was actually done, not merely repeat the original tender scope.
- Store final records in a strata-controlled location.
- Schedule future review from current documents rather than an invented universal interval.